Followers

Click

Group Survey of Campus

 Team 1: Mr. Mohan/HR

1.       Ramp in front of main entrance

2.       Lift in front of main entrance

3.       Sensor & door closer all toilets

4.       More security

5.       Wall seepage

6.       Wi-fi zone

7.       Floor mats

8.       Renovation room 110

9.       Separate room for Yoga practice regularly

10.   A new diary with a pen (annually) instead of training kits for each programme

11.   Water dispenser instead of plastic water can

12.   Renovation VIP Hall

Team: 2 Mr. Siva Kesava Reddy S

1.       Wall cracks at auditorium

2.       LDC vision statement to be displayed at entrance

3.       LDC organisational chart to be displayed at entrance

4.       Notice board data to be removed and updated

5.       Roof false ceiling damage in room 115

6.       Wall seepage and AC issues at room 115

7.       Proper cleaning of water dispenser at dining hall

8.       Unwanted material is to be taken out from dining hall

9.       Painting works in general

10.   Toilet works at room 124 (near mini auditorium)

11.   Energy conservation at LDC.

Team: 3 Mr. Sivasankaran K

1.       Additional personal computers (PC) for ATS section

2.       Photocopying machine (colour)

3.       Waiting area for apprentices and parents during engagement process.

4.       New toilets for basic training centre (BTC)

5.       BTC name board needs to be repainted and back door of BTC workshops needs to replaced.

6.       Arrangement of RO water facility at BTC workshops.

 Team: 4 Mr. Ilamaran R

1.       Dining hall: To provide TV facility / To shift or modify the location of disposable plate area / To provide ladies toilet facility / To make use of dryer in washing area / Change the food menu

2.      Multi-purpose hall: To provide A/C facility to make the hall

3.      Shed area: To make arrangement to display the name of each shed

4.      Apprentice dining area: Presently not utilized by the apprentice and requested for make use of it by the way good ambiance

5.       Above room no 131: To clear the seepage from the toilet and toilet accessories repair

6.      All the pathway of LDC: To provide planters pot in each pathway of LDC to make the greenery look

7.       CCTV facility: To provide CCTV facility back side of compound wall to access the movement

8.      Facelift of front view of LDC: To provide spot light facility in granite stone LDC name board facelift the front view of LDC

9.      To provide lighting arrangement for statue of Visvesvaraya

10.   Entrance cattle trap: To provide anti-skid type cattle trap.

https://freeglobaluniversity.blogspot.com/search/label/Camp

No comments:

Labels