Team
1: Mr. Mohan/HR
1. Ramp in front of main entrance
2. Lift in front of main entrance
3. Sensor & door closer all toilets
4. More security
5. Wall seepage
6. Wi-fi zone
7. Floor mats
8. Renovation room 110
9. Separate room for Yoga practice
regularly
10. A new diary with a pen (annually)
instead of training kits for each programme
11. Water dispenser instead of plastic
water can
12. Renovation VIP Hall
Team:
2 Mr. Siva Kesava Reddy S
1. Wall cracks at auditorium
2. LDC vision statement to be displayed
at entrance
3. LDC organisational chart to be
displayed at entrance
4. Notice board data to be removed and
updated
5. Roof false ceiling damage in room
115
6. Wall seepage and AC issues at room
115
7. Proper cleaning of water dispenser
at dining hall
8. Unwanted material is to be taken out
from dining hall
9. Painting works in general
10. Toilet works at room 124 (near mini
auditorium)
11. Energy conservation at LDC.
Team:
3 Mr. Sivasankaran K
1. Additional personal computers (PC)
for ATS section
2. Photocopying machine (colour)
3. Waiting area for apprentices and
parents during engagement process.
4. New toilets for basic training
centre (BTC)
5. BTC name board needs to be repainted
and back door of BTC workshops needs to replaced.
6. Arrangement of RO water facility at
BTC workshops.
Team:
4 Mr. Ilamaran R
1.
Dining hall: To provide TV facility / To shift or modify the location of
disposable plate area / To provide ladies toilet facility / To make use of
dryer in washing area / Change the food menu
2.
Multi-purpose hall: To provide A/C facility to make the hall
3.
Shed area: To make arrangement to display the name of each shed
4.
Apprentice dining area: Presently not utilized by the apprentice and
requested for make use of it by the way good ambiance
5.
Above room no 131: To clear the seepage from the toilet and toilet
accessories repair
6.
All the pathway of LDC: To provide planters pot in each pathway of LDC
to make the greenery look
7.
CCTV facility: To provide CCTV facility back side of compound wall to
access the movement
8.
Facelift of front view of LDC: To provide spot light facility in granite
stone LDC name board facelift the front view of LDC
9.
To provide lighting arrangement for statue of Visvesvaraya
10.
Entrance cattle trap: To provide anti-skid type cattle trap.
https://freeglobaluniversity.blogspot.com/search/label/Camp